3.10 Updates

The daemon changes the outstanding page without a new turn by broadcasting Update:

FieldMeaning
seqThe outstanding turn.
fullReplacement or patch.
elementsSee below.

A sparse update (full absent or false) carries patches: objects naming an existing element by ref plus the fields that change — a progress value, appended log lines, an error, an enabled flip, a refreshed choices. A patch key set to null removes that field. A patch MUST NOT name a ref absent from the turn, and MUST NOT carry a secret element's collected value (§3.4).

A full update (full: true) carries complete elements and replaces the turn's element list. It is the only way the set of refs may change mid-turn. Changing the set is legal but SHOULD be rare — a page that reshapes itself is usually two turns — and a surface's obligation is only to re-render from scratch, which is why a full update must be complete.

Updates are how progress happens: a working page is one turn with no inputs (§3.7), updated as the work advances, so that every attached surface — and any that attach midway — shows the same state.

3.10.1 Folding #

The daemon MUST fold every update into its stored copy of the outstanding turn, and the turn it sends a late joiner (§3.6) is that folded state. An update is therefore transient on the wire but never lost: attaching and having-been-attached see the same page.

A surface receiving an update for a seq it does not hold MUST ignore it — the TURN that supersedes it is already on the wire. A sparse update naming a ref the surface does not know is a daemon defect; the surface SHOULD fail the conversation rather than guess.